Surveyor (Quantity)

Surveyor (Quantity)
Introduction
The Course in Quantity Surveying has been intended to furnish you with cutting edge information and comprehension of amount studying procedures and work on including debate determination, venture administration and esteem and hazard administration. This course empowers you to have a comprehension of the major exercises which contain amount looking over and it will likewise take you through an intelligent arrangement of considering amount reviewing. The learning exercises draw on both the speculative circumstances regularly found in amount looking over and from one's close to home experience inside the working environment.

General Information
Course Industry:
Surveyor (Quantity)
Course duration:
240 credit hours (45 days)
Instructor:
Mr. Raja Muhammad Akbar
Prerequisites:
Middle or Matriculate
Course availability:
Available at Rawalpindi, Lahore and Karachi campuses.
Course Fee:
17,000 PKR ($340)

Desire Learning Objective

This course will help you to:

•           Manage the key and regulatory strategies required in the acquirement

             of development work.

•           Understand the central abilities required by surveyors working in the

            development industry.

•           Improve and build up the relationship between time, expense and quality in the

             development acquisition process and the option obtainment courses accessible.

•           Understand the administration and organization of development contracts.

•           Identify and clarify the part of the different members in your own local

             development industry.

•           Understand the accessible choices for the obtainment of development work.

•           Manage time, expense and quality on a development venture.

•           Understand the procedure of estimation and assessing.

•           Understand and consider contract organization with respect to the legitimate

             premise for controlling development ventures.

 

Instructional Techniques

We impart knowledge and Practical Training in following way:

Ethics, discipline, motivation, health and safety training: Half an hour daily           (10%) 

Theoretical knowledge:                                                                  One (01) hour daily              (25%)

Hands on Training:                                                                              Six (06) hour daily                (65%)


COURSE CONTENTS

Work Classification

·         ™Standard method of measurement: civil engineering standard method of
           measurement (cesmm3)

·         ™Application and extent

·         ™Object of cesmm3

·         ™Object of the bill of quantities

Application of the Work Classification

·         ™Item description

·         ™Mode of description

·         ™Separate items

·         ™Units of measurement

·         ™Measurement rules

·         ™Definition rules

·         ™Coverage rules

·         ™Additional coverage rules

·         ™Applicability of rules

Coding and Numbering of Items

·         ™Coding

·         ™Item numbers

·         ™Coding of unclassified items

·         ™Numbering of items with additional description

Preparation of the Bill of Quantities

·         Measurement of completed work

·         Sections of the bill of quantities

·         List of principal quantities

·         Preamble

·         Day work schedule

·         Work items: division of the bill of quantities into parts; headings and subheadings;
           extent of  itemization and description; descriptions; ranges of dimensions; prime
           cost items; provisional  sums; quantities; units of measurement; work affected by
           water; ground and excavation levels;  form and setting

·         Grand summary: general contingency allowance; adjustment item; total of the
           priced bill of quantities

Completion, Pricing and Use of the Bill of Quantities

·         ™Insertion of rates and prices

·         ™Parts to be totalled

·         ™Adjustment item

Method-Related Charges

·         ™Definitions

·         ™Insertion by a tendered

·         ™Itemization

·         ™Description

·         ™Contractor not bound to adopt method

·         ™Charges not to be measured

·         ™Payment

·         ™Payment when method not adopted