Suspended Ceiling Installer

Suspended Ceiling Installer
Introduction
Suspended Ceiling Installer set up a wide variety of ceiling systems and exterior finishes, bringing various buildings to a completed state.

General Information
Course Industry:
Suspended Ceiling Installer
Course duration:
240 credit hours (45 days)
Instructor:
Mr. Abdul Rasheed Awan
Prerequisites:
Middle or Matriculate
Course availability:
Available at Rawalpindi, Lahore and Karachi campuses
Course Fee:
10,000 PKR ($ 200)

Desire Learning Objective

This course will help you to:

•           Know the qualities and comprehend the activities and communications of Lathing             and Interior Systems

•           Mechanic materials

•           Interpret arrangements and determinations and format and create extends as                       needs be

•           Calculate material amounts

•           Use hand instruments and controlled gear in an appropriate and safe way

•           Construct different sorts of roofs and apply outside and inside trim of metal and                 other material

•           Relate to the work of different trade individuals in the building business

•           Perform allocated undertakings as per quality and generation benchmarks                              required in industry.

 

Instructional Techniques

We impart knowledge and Practical Training in following way:

Ethics, discipline, motivation, health and safety training:  Half an hour daily              (10%) 

Theoretical knowledge:                                                                       One (01) hour daily              (25%)

Hands on Training:                                                                                     Six (06) hour daily              (65%)

 

COURSE CONTENTS:

Trade Introduction

  •          Plan & organize work
  •          Carry out measurements & calculations
  •          Read and understand plans and specifications

Apply Trade Related Communication

  •          Use Trade-Related Communication
  •          Conduct workplace communications

Apply Safe Work Practices

  •          Use Personal Protective Equipment
  •          Control Workplace Hazards
  •          Apply WHMIS
  •          Apply Safety Regulations and Standards
  •          First Aid Training

Apply Codes, Standards and Documentation

  •          Apply Codes, Regulations and Standards
  •          Apply Fire Assembly Requirements

Prevent and Correct Mould

  •          Prevent Mould
  •          Correct Mould Problems

Use Ladders, Scaffolds and Lift Equipment

  •          Use Ladders, Platforms and Lifts
  •          Use Fall Arrest and Fall Restraint Systems
  •          Perform Approved Rigging and Hand Signals

Use Tools and Equipment

  •          Utilize Hand Tools
  •          utilize Power Tools
  •          utilize Powder-Actuated Tools
  •          utilize Pneumatic Tools 
  •          Utilize Gas-Actuated Tools

Trade Mathematics

  •          Shop Mathematics
  •          Geometry and Trigonometry

Blueprints and Specifications

  •          Use Blueprints and Specifications
  •          Draw Floor and Ceiling Plans

Estimating and Project Planning Skills

  •          Use Estimating Methods
  •          Plan a Project

Install Insulation 10 47

  •          Install Thermal Insulation
  •          Install Acoustical Insulation
  •          Install Vapour Barriers and Sealants

Install Non Load-Bearing Metal Framing

  •          Build Walls, Ceilings and Bulkheads
  •          Install Wood and Metal Backing
  •          Install Metal Doors and Window Frames
  •          Install Access Panels

Install Load-Bearing and Metal Framing 36 60 80

  •          Build Wind Load and Axial Load-Bearing Walls
  •          Prefabricate and Install Walls and Panels
  •          Install Floor Joists and Roof Rafters
  •          Build Exterior and Insulated Walls
  •          Rain screen Walls and Curtain Walls

Install Fireproofing and Soundproofing

  •          Install Materials for Soundproofing Assemblies
  •          Install Materials for Fireproofing and Smoke Seal Assemblies
  •          Install Materials for Lead Radiation Shielding

Install Acoustical Ceilings

  •          Apply Layout Methods
  •          Build Acoustical Ceilings
  •          Build Feature Ceilings

Apply Lath, Wire, and Trims to Ceilings

  •          Install Metal Lath on Ceilings
  •          Install Plaster Beads, Expansion Joints and Plaster Stops